Foundation
Home Up Foundation Excavation Log Progress Roofing

 

To see larger views of any of these pictures, click on the picture.

THP7270164.JPG (10962 bytes)
Starting footing
forms
7/27/05
THP7270166.JPG (10186 bytes)
Footing forms
7/27/05
THP8030198.JPG (4187 bytes)
Footings
8/3/05
THP8030199.JPG (4105 bytes)
Footings
8/3/05
THP8100210.JPG (4600 bytes)
Basement forms
8/10/05
THP8100212.JPG (4642 bytes)
Basement forms
on back wall
8/10/05
THP8100213.JPG (4606 bytes)
Basement forms
looking toward NW
8/10/05
THP8100218.JPG (4972 bytes)
Pouring basement
walls
8/10/05
THP8100219.JPG (4757 bytes)
Pumping concrete
into back wall

8/10/05
THP8100222.JPG (3782 bytes)
Pumper truck
beside garage
8/10/05
THP8100227.JPG (4820 bytes)
View of pouring
from hillside above
8/10/05
THP8100229.JPG (4638 bytes)
Pouring concrete -
looking east
8/10/05
THP8120241.JPG (7742 bytes)
Finished garage
walls
8/12/05
THP8120249.JPG (10124 bytes)
Finished basement
walls
8/12/05
THP8170268.JPG (11696 bytes)
Blue marks trees
to cut for fire mitigation
8/17/05
THP8170277.JPG (10772 bytes)
Utility trench
8/17/05
THP8170271.JPG (9434 bytes)
Backfilling
8/17/05
THP8170275.JPG (10802 bytes)
Backfilling
8/17/05
THP8170291.JPG (10450 bytes)
Backfilling
8/17/05
THP8230386.JPG (8329 bytes)
Basement floor w/
plumbing, foam & sand
ready to pour concrete
8/23/05
THP9010447.JPG (5943 bytes)
Basement floor
9/1/05
THP9010448.JPG (8246 bytes)
Steel for basement
9/1/05
THP9010451.JPG (5869 bytes)
In floor heat tubes
9/1/05
THP9010453.JPG (6373 bytes)
Basement floor - looking
up at garage floor
9/1/05
THPA130107.JPG (10037 bytes)
Backfilling
10/13/05
THPA140111.JPG (10163 bytes)
Backfilling
10/14/05
THPA140113.JPG (8497 bytes)
Drilling to place
rock bolts
10/14/05
THPA140114.JPG (9286 bytes)
Drilling to place
rock bolts
10/14/05
THPA140117.JPG (8571 bytes)
Rock bolts to be
installed - 12 ft long
10/14/05
THPA140120.JPG (9327 bytes)
Screwing in
rock bolts
10/14/05